Portfolio

Remove and replace old shower cubicalRipple, GL20

Removal of old shower tray and enclosure. Fitting of new low profile shower tray on custom made wooden plinth and new easy to clean glass enclosure.

After:Shower After

Before:Shower Before

Repair and Repaint WindowRipple, GL20

Complete strip back and repair of rotten wooden window with 3 coat repaint.

After:Window After

Before:Window Before

Stone Fireplace FittingGloucester, GL1

Installation of a stone fireplace surround against a plasterboard wall ready for an electric standing fire.

After:
Fireplace After

Before:
Fireplace Before

Front Garden Tidy UpCheltenham, GL50

A front garden in need of a tidy up! Lots of weeding, new membrane laid, wooden edges replaced and repaired and central patio jet washed.

After:
Garden After

Before:
Garden Before 1

Cloakroom Rip Out and ReplaceUpton upon Severn, WR8

Removal of all existing fittings, wallpaper and panelling before making good all walls.
New wood panelling installed, vinyl floor laid, walls wallpapered, everything painted and toliet, radiator and basin cleaned up and reinstalled..

After:Cloackroom After

Before:Cloakroom Before

Garden LandscapingCheltenham, GL51

A blank sloping garden in a newly built Cheltenham property. The customer wanted the original patio extended, a second sun patio in the bottom corner or the garden and a raised planter.

After:
Garden After
Garden After

Before:
Garden Before 1
Garden Before 2

Front Garden Pond Area Clear UpDrakes Broughton, WR10

Remove overgrown bushes, brambles and grass, uncover overgrown crazy paving and bring back a ready to plant pond area..

After:Pond After

Before:Pond Before

Construction of bin store raised planterRipple, GL20

To tidy up and install an attractive planter in an otherwise unusable area. Made using C16 treated wood to then be painted to blend with surroundings.

Bin Store

Garage ConversionRipple, GL20

Conversion of junk filled garage into a study room.
This project involved plasterboarding and insulating all walls and ceiling, a plaster skim over the boards and then the installation and certification of a new electrical circuit by a trusted contractor.

After:Garage After

Before:Garage Before

Brambles and Ivy removalRipple, GL20

Removal of substantial quantity of brambles around a tree and the susequent removal of ivy, weeds and grass from a wall and flower bed.

After:Brambles After

Before:Brambles Before

Bathroom RenovationRipple, GL20

The removal of an old electric shower unit, shower tray and also decorative beam. The shower are had to be reboarded with Knauf Aquapanel, new tray and glass screen installed and floor leveled and covered with new vinyl flooring. I then employed a trusted plumber to fit a new Mira Platinum digital shower.

After:Shower After

Before:Shower Before

Kitchen Sink ReplacementRipple, GL20

The original metal sink was removed and replaced by a much brighter white ceramic sink and tap.

After:Kitchen Sink After

Before:Kitchen Sink Before

Cloakroom Redecoration and PlasterCheltenham, GL51

All old wallpaper removed from the room to find the plaster beneath in a very poor state of repair. Stripped off all loose areas and reskimed all walls. All walls, ceiling and wood work then repainted to the client's specifications.

After:
Cloakroom After

Before:
Cloakroom Before

Wall Repair and Electric Radiator InstallRipple, GL20

After removing an old night storage heater the wall behind was in a poor state of repair. This was made good prior to the installation of the new electric radiator with bluetooth control.

After:Radiator After

Before:Radiator Before